
Industrial Commercial Owner’s Guide • INSTALLATION • OPERATION • MAINTENANCE • SERVICING READ AND SAVE THIS INSTRUCTION MANUAL EVAPORATIVE
INSTALLATION OF EVAPORATIVE COOLERS PREPARATION 1. All electrical and duct work must comply with local and federal codes. 2. Make arrangements to get
MOTOR PULLEY ADJUSTMENT Before installing the motor pulley, loosen the set screw on the back side of the pulley and turn the outside jaw of the pulley
START UP After installing cooler and before filling with water: 1. Open windows and doors or other exhaust openings in building. 2. Turn on cooler and
CS75/85 & CD75/85 REPLACEMENT PARTS / REPUESTOS CS75/85 CD75/85 ITEM DESCRIPTION DESCRIPCIÓN PART NO. NO. DE REF. QTY. CAN. PART NO. NO. DE REF.
CS75/85 & CD75/85 REPLACEMENT PARTS / REPUESTOS To order replacement parts, please call “The Cooler Hotline” at 1-800-643-8341. To ensure promp
CS11/16, CD11/16 & CD21 REPLACEMENT PARTS / REACCIONES To order replacement parts, please call “The Cooler Hotline” at 1-800-643-8341. To ensure
CS11/16, CD11/16 & CD21 REPLACEMENT PARTS / REACCIONES CS11/16 CD11/16 & CD21 ITEM DESCRIPTION DESCRIPCIÓN PART NO. NO. DE REF. QTY. CAN. PA
Comentarios a estos manuales